Lindner Prater is one of the UK’s leading specialist building envelope contractor’s and has worked on a variety of projects spanning across the country from the likes of: Wimbledon Court No1, Network Rail, London Bridge Redevelopment, Alliance and Moxy Hotel, Stratford.
We were bought in and instructed to carry out some restoration works for our client in Salfords, Surrey. The reinstatement works costs were planned around the failed heater causing water damage on the 1st floor of the building.
Office Reinstatement Service Works Included:
The project office reinstatement works ensured that the floor was safe to use and also replaced water damaged items that included kitchen units and flooring as well as building works that involved the chopping out of walls, supporting dwarf walls and redecorating to present a usable, workable and reinstated business space. Transforming a water damaged floor into one that can be operated within and that is safe for staff and colleagues to carry out their duties within.
If you are relocating or refurbishing, expanding or consolidating, re-branding or simply refreshing, we will work with you to create the right workplace. Give us a call or drop us a line via the form to see how we can help with your project.
Give us a call on 01293 775509 or email at sales@tbfitout.co.uk
Get your free Refurb eGuide(recieve our monthly industry insights too)
Forgot your password? Reset it here
Enter your email address below.Your password will be reset and emailed to you
Cancel and return to login